|
3D
Laser Scanning (since 2001)
3D laser scanning offers extensive possibilities for the documentation
of existing buildings (as-built documentation) as well as planning
visualisation and performance control. The geometry data obtained
represents an essential basis for the most varied planning activities
due to its quality and high degree of interpretation assurance.
|
 |
–
Construction measurement and surveying (building/railway
stations, tunnels, bridges)
– Surveying of civil engineering works
– Quality assurance
– Survey of land
– Subgrade/geometry control |
| back |
|
Ultrasonic testing - non-destructive material testing in the railway
industry sector (since 2003)
Non-destructive ultrasonic material tests are used for quality assurance
in new constructions and the verification of operationally safe
conditions of railway tracks and switches. Ultrasonic tests are
a universally usable test method to locate faults which are internal
and close to the surface of tracks and components.
|
 |
–
Location of faults/subsequent location
– Measurement of wear and tear
– Diagnosis
– Reconstruction proposal
– Documentation
– Expertise |
| back |
|
K:I:S
- Customer Information System, Customer Management Software (since
2002)
The subject of Customer Relationship Management (CRM) is constantly
moving into the centre of strategic company alignment. An individual
software for the effective support of Marketing, Sales and Service
was been developed to optimise the business process of a furniture
manufacturer.
|
 |
–
Compact presentation of customer information
– Modular software for orders, sales, offers, dealer
assessments, statistics, time schedule management,
action plan
– Integration of the existing heterogeneous data scenery:
e.g. ERP systems (SAP)
– Internet connection of salesforce |
| back |
|
Germany's
federal state of Brandenburg: Strategic environmental audit in the
context of the Structural Funds Program of the European Union (EFRE,
ESF), (since 2006)
In 2006 so
called "Operational Programs (OP)" are set up by Germany's federal
states to apply for funds out of the Structural Funds of the European
Union (EFRE, ESF). This concerns a period of 6 years, beginning
in 2007. Via those programs certain infrastructural projects are
supported with EU-funds.
|
 |
Within
the scope of the Operational Programme of the
federal state of Brandenburg Pöyry Infra is commissioned
by the Department of Trade and Industry to conduct the
strategic environmental audit for the fund strategy.
In addition Pöyry Infra is responsible for the examination
of the funds concept in certain fields of investment. |
| back |
|
Avifauna
study for wind-power generators in western Brandenburg, Germany
(since 2003)
Further wind-power generators are planned to be erected in western
Brandenburg, Germany. In order to assess the effects of these wind
parks on bird-life (avifauna), PÖYRY INFRA was commissioned
to carry out an extensive investigation of a total of 102 wind power
generators in 11 wind parks.
|
 |
–
Fieldwork in a corridor of about 25 km length and
18 km width
– Determination and evaluation of the functional relationship
of birds in the area (key parameters: number, height,
direction, type of flights, flight behaviour,
collision risks, flocking behaviour, food areas,
sleeping roosts, etc)
– Representation of client and presentation of findings to
nature protection authorities and associations |
| back |
|
|
TunnelAsset
- maintenance software with statistic tunnel analysis and integrated
measure and cost management
On behalf
of the Swiss Federal Railways (SBB), the TunnelControl SBB maintenance
software developed during the nineties is redesigned. The current,
modular and web-based TunnelAsset application supports the maintenance
management at SBB in damage acquisition, measure and cost planning
as well as statistic evaluation of tunnels.
|
 |
–
Administration of master data and measures of tunnels
– "Graphic diagnosis" CAD module to acquire damage
– Statistic evaluation of inspections and damage as well as
conditions and measures of one or several tunnels and
their zones in the SBB route network
– Browser-based solution in Java, database Oracle
– Integration into the EDP system environment (OPUS)
and interfaces to the SBB SAP systems |
| back |
|
|
PQBau
- EDP-aided implementation of a prequalification procedure for construction
works
A procedure to examine the suitability of companies independent
of the placement of orders has been developed in cooperation with
PÖYRY INFRA in the DB Netz AG business sector of construction
works. The PQBau EDP solution of PÖYRY INFRA is a system in
which data acquisition, automatic evaluation of companies and the
representation of the workflow of the PQ procedure at DB Netz AG
as well as the access of applicants via the Internet has been realised.
The system supports the procedure in different product areas: Track
system, construction engineering, construction supervision, safety
work, general underground engineering and special underground engineering.
|
 |
–
Conception and development of a modular software system
for DB AG to support the PQ procedure in the areas of
data
administration, evaluation and administration
– Conception and development of an Internet portal for
applicants for web-based data input and evaluation
– Development of a search system for the database of
prequalified companies |
| back |
|
|
Implementation
and evaluation of a weak spot and system survey in the area of logistics
and picking
Enkler
GmbH is a forwarding firm in the warehousing and transportation
business. The company employs about 200 people and disposes of a
fleet of 45 trucks and a storage area of approx. 70.000 sqm (www.enkler.de).
Optimising of business process chains in the complex environment
of logistics and picking was the goal of a business process analysis.
Using REFA methodology procedures concerning the receipt of goods,
processing, picking, and the issue of goods were analysed. In addition,
the work flow of administrative activities were especially scrutinised
to show the discontinuity of media and optimising potential.
|
 |
– Interviews with process participants
– Conception and
implementation of the survey
– Preparation
of a plan of action including prioritised proposals for measures
– Preparation
of a rough concept for an increase in efficiency of
administration procedures using supporting EDP solutions. |
| |
|
| back |
|