New
Projects
Feasibility
study for a Central Albanian road connecting the business
region of Tirana-Durres and the frontier region near the Greek
border
Overall
design of the new rail line "Siatista - Kozani", Greece
New
building of the electronic interlocking technology of the
right Rhine line section, Germany
Superstructure
investment program 2006
Reconstruction
of the nodal point "Frankfurt/Main-Sports field"
City
of Burg, Germany: new building of a power plant/paper machine
in the industrial area - legal immission control procedure
Railway
equipment for the Gotthard base tunnel, Switzerland
Construction
control of the New Eastern Ring Road in Wittenberg, Germany
Extension
of the PKV container terminal Duisburg, Germany
Second
project for the establishment of the Project Implementation
Unit (PIU) to the Serbian Railways, Republic of Serbia
Feasibility
study for a Central Albanian road connecting the business
region of Tirana-Durres and the frontier region near the Greek
border
With
this survey, the Albanian Ministry for Transport and Telecommunication
pursues two goals: On the one hand, it verifies a fast, safe
and efficient road connection to the business region of Saloniki
(Greece) in view of the future EU membership. On the other
hand, previously undersupplied regions in Central South Albania
with towns like Elbasan, Berat and Kucova are supposed to
be connected to the business region of Tirana and the most
important Albanian Port in Durres.
Pöyry Infra works on the survey in three corridors of 125
km in length each on behalf of the General Roads Directorate
in Tirana (Albania).
-
Evaluation of topographic and geomorphologic fundamentals
from satellite data
using
remote sensing methods
- Line development and cost estimate
- Underground assessment
- Environmental impact survey
- Traffic survey including a forecast for 2015/2025
- Evaluation of the effectiveness of the preferred line in
relation to traffic
back
Overall
design of the new rail line "Siatista - Kozani", Greece
Pöyry
Infra GmbH has been awarded a contract to undertake the alignment
design of the new railway line Siatista-Kozani for the Greek
National Railway Network. This project will be executed in
co-operation with two Greek consultants, Salfo & Associates
and S. Liaros - Helida Engineering Consultants.
The contract comprises consultancy engineering services for
reviewing and updating the existing feasibility study of the
Hellenic Railways Organisation for the Siatista-Kozani segment.
In order to optimise the technical characteristics of the
line, the contract includes the designs of all the necessary
civil works and the rehabilitation of the road network. The
main structures are two tunnels of approx. 1300 m and 650
m.
Services
provided:
- Preliminary and final design for the railway alignment and
the railway stations
- Preliminary and final structural designs
- Topographical surveys and expropriation maps
- Environmental Impact Assessment and assistance in obtaining
all the
necessary clearances
- Hydraulic designs
- Geological surveys and reports
- Geotechnical investigations and assessments
- Electromechanical designs
- Health & Safety Plans for design
Pöyry
has an excellent track record for major transportation projects
in Europe. The award of this project in Greece further strengthens
the Group's position in the region, which remains an important
strategic market.
back
New
building of the electronic interlocking technology of the
right Rhine line section, Germany
The
line section on the right side of the river Rhine, between
Troisdorf and Wiesbaden, is considered the most important
North-South axis of the western federal territory. It connects
the metropolitan area Rhine/Ruhr with the Greater Rhine/Main.
The project´s subject is the new building of the electronic
interlocking technology of this section including all cohesive
works, such like the building of cable lines as well as track-
and road crossings, the installation of cable chutes, concrete
piles and other special constructions. In addition installation
works for control- and safety technology are carried out in
the entire section.
The first building stage comprises the section Lorch - Oberlahnstein
up to Wiesbaden - East - Niederlahnstein with total length
of more than 42 km.
The
following services are provided by Pöyry Infra in cooperation
with
BPB - Verkehrswesen GmbH:
- Site supervision for cable underground works/control- and
safety technology
- Operative cooperation in the overall coordination
- Cooperation in contract management as well as in supplementary
works
- Quality assurance
back
Superstructure
investment program 2006
The
superstructure program comprises new replacement constructions
of selected railway operation facilities of DB AG infrastructure
entities to improve the performance capabilities of the rail
network. Numerous individual measures are integrated into
the running railway operation. This mainly concerns the renewal
of switches and tracks employing different procedures for
track construction.
-
Local construction supervision for the areas of superstructure
and civil engineering
- Co-ordination of operational and operational safety measures
- Contract and supplement management
- Invoice verification
- Quality management
Sections
I to IV in engineering Cupertino with the BGS / SPI / ZKP
offices
back
Reconstruction
of the nodal point "Frankfurt/Main-Sports field"
In
line with the planned construction of the nodal point "Frankfurt/Main
- Sports field, 1. stage of extension / 1. construction stage"
the changeover of signal installations to electronic interlocking
technology is carried out. For this change extensive underground
cable engineering works as well as gentries are necessary.
This project underlies the official railway interoperability
regulation (Eisenbahn-Interoperabilitätsverordnung - EIV)
and has to comply with the committee's decision concerning
the technical specification of the interoperability of the
sub-system "infrastructure" of the trans-European high speed
system. This decision was published on September 12, 2002
in the Official Journal of the European Union.
Pöyry Infra provides in this regard site supervision services
for the roadway as well as for control- and safety technology.

back
City
of Burg, Germany: new building of a power plant/paper machine
in the industrial area - legal immission control procedure
Burg´s
industrial area ought to be extended by a spate of infrastructural
facilities. Here the new building of a power plant, a paper
machine and a waste water treatment plant takes centre stage.
With an investment volume of approx. 650 million Euros this
project is among the biggest operational investments of the
federal state Saxony-Anhalt in the next years.
Pöyry Infra supports the competent authority in the legal
immission control procedure (BImSchG - immissionsschutzrechlichen
Genehmigungsverfahren).
Pöyry
Infra
is furthermore responsible for the preparation
of expert´s reports concerning the environmental impact study,
noise (TA Lärm), concentrations (TA Luft), exhalation (GIRL)
and hydrology. The design of the railway siding including
the allocation to the plants is also rendered by Pöyry Infra.

back
Railway
equipment for the Gotthard base tunnel, Switzerland
The
longest railway tunnel in the world is being constructed through
the Gotthard massif.
The requirements of the railway equipment of the tunnel section
(2 x 57 km) and the immediately adjacent new multitrack lines
of, in all, 10 km to the south and north represent a big challenge
for all involved. Tried and tested innovative solutions are
required taking the special tunnel conditions as well as the
high operational load of a high-speed and high-capacity line
(Ve = 250 km/h) into consideration.
Within the syndicate, Pöyry Infra is responsible for
offer processing concerning the RAMS analysis (RAMS - Reliability,
Availability, Maintainability, Safety) according to EN 50126
as well as for the professional support of the overhead contact
line section.

back
Construction
control of the New Eastern Ring Road in Wittenberg, Germany
The
New Eastern Ring Road of 1.5 km in Luther's Wittenberg (Germany)
crosses the railway line of Horka-Roßlau and the TEN section
No. 1 Berlin-Halle/ Leipzig by two bridges. Taking the special
railway operation concerns into consideration the bridges
are erected in composite steel and concrete structure using
prefabricated girders. The complex road construction also
involves two large intersections with traffic lights and a
parallel footpath and bicycle track as well as extensive line
relocation. A wall of 4 m in height protects against noise.
In order to minimise the interference in a brook habitat the
structures have been planned to allow otters and beavers to
penetrate.
Overall planning including numerous individual planning projects
has already been completed. Pöyry
Infra will primarily
render the following subsequent services:
-
General construction management
-
Railway construction supervision
-
Operational construction planning and co-ordination

back
Extension
of the PKV container terminal Duisburg, Germany
The PKV
container terminal Duisburg-Ruhrort-Hafen (PKV - Planungsgesellschaft
Kombinierter Verkehr mbH) presently consists of 5 tracks and
the pertaining storage and loading tracks for containers.
Two portal frames and additional mobile equipment handle the
transfer. The existing capacities of the terminal are exhausted
and thus an extension has been planned.
The terminal
will be extended to a total of eight parallel tracks. In addition
to the two existing portal frames, a third one will be installed.
The reception yard will be connected by additional switches
so that four tracks will have a separate reception yard respectively.
The overhead contact lines of the southern reception yard
tracks will extend to the position of the engine. Via the
development of a new storage area of approx. 7,000 m² there
is the possibility to newly arrange the existing gate way
and the storage area for the trucks.
Pöyry
Infra is the general planning contractor and has received
orders for all HOAI (German Official Scale of Fees for Services
by Architects and Engineers) performance phase as well as
for the site supervision:
-
Traffic facilities (tracks, moving
and loading tracks)
-
Storage area (approx. 7,000 m²)
-
Technical equipment
-
Signalling
-
Overhead contact lines
-
Drainage facilities
The approval
procedure by EBA Essen has largely been finalised. .
Building is anticipated to start with the construction of
the new storage area in October 2006. The extension is supposed
to be completed by August 2007.

back
Second
project for the establishment of the Project Implementation
Unit (PIU) to the Serbian Railways, Republic of Serbia
Pöyry
Infra GmbH in consortium with Salfo & Associates Ltd. and
T&O Unternehmensberatung (Business Consultancy) has been awarded
a consultancy contract for the second project for establishment
of the Project Implementation Unit (PIU) to the Serbian Railways
(ZS).
This
programme consists of numerous schemes to be packaged in individual
lots for tendering. Loans are provided by the European Investment
Bank (EIB) and European Bank of Reconstruction and Development
(EBRD). The EIB financed components concern the rehabilitation
of railway lines, part-financed with a loan up to 80 MEUR.
The EBRD financed components concern the rolling stock refurbishment
and the supply of equipment, part-financed with a loan up
to 60 MEUR.
The specific
objective of this project is to assist the Serbian Railways
in the successful implementation of the project within the
timeframe and budget specified in the loan agreements with
the EIB and the EBRD in accordance with the procurement rules
of each institution. The PIU is effectively responsible for
the co-ordination, management, monitoring, financial control,
project reporting and evaluation of all aspects of the programme
implementation. At the same time appropriate in-service training
has to be provided to the management staff of the Serbian
Railways and information to the sector operators. If required,
ad hoc professional support in the sector shall be provided
by the European Agency for Reconstruction.
During
the project, which is currently planned to be implemented
within 30 month, the consortium will be involved in the following
activities:
-
Review, preparation and modification
of a detailed Procurement and
Implementation Plan (PIP)
-
Based on the approved PIP:
-
preparation of technical specifications,
project designs/requirements and/or
bill of quantities for preparation
of tender documents
-
tendering procedures with pre
or post-qualification as relevant
-
organisation and management of
the tendering process for each contract
-
monitoring of works
-
contract implementation and administration
-
In-service training to management
staff of the Serbian Railways and professional support
in the sector as and if required by the European
Agency for Reconstruction